Yield and Fertilizer

Rice Fertilizer Schedule by Target Yield, in Bags per Hectare

A rice fertilizer schedule tells you what to apply, how many 50 kg bags per hectare, and on which day. The plan below is the general recommendation for fields with no soil test. Pick the table for your target yield and the column for your variety's maturity. Then count the days from transplanting (DAT) or sowing (DAS).

7 min read Updated October 17, 2026 By the anee.io agriculture team
A farmer broadcasting fertilizer by hand over a young green paddy, one dose in a rice fertilizer schedule
Photo: Soumya B, Public domain, via Wikimedia Commons

A general plan is a starting point, not a soil test. It assumes an average irrigated lowland field. Your own soil may hold more of one nutrient and less of another. So let a leaf color chart adjust the urea, and test the soil before next season.

Every bag here is a 50 kg bag, and every rate is per hectare. For a smaller lot, multiply by its size in hectares. A quarter hectare takes a quarter of each number.

Choose your target yield and maturity group

The yield you aim for sets how much nutrient the crop must take up. So pick a target you have reached before on the same field, not the best harvest you have heard about. Then check the seed bag for the variety's days to maturity, or look it up in our rice varieties finder.

The plan sets three targets for inbred rice: 3 to 4, 5 to 6 and 7 to 8 tons per hectare. Hybrid rice gets its own plan for 6 to 7 tons. Each target then splits by maturity into 100 to 110 days, 111 to 120 days and 121 to 130 days. Longer varieties get their top dressings later, because they reach tillering and panicle initiation later.

Organic matter and the seedbed come first

The schedule starts before transplanting. Return the straw from your last crop, about one ton for every ton of target yield. Plow it in 30 days before transplanting so it has time to rot. Then, two weeks before transplanting, spread 10 bags of chicken manure or vermicompost and mix it into the mud.

Steps before and around sowing, per hectare, from the general plan
Step3 to 4 tons5 to 6 tons7 to 8 tonsHybrid, 6 to 7 tons
Rice straw, plowed in 30 days before transplanting3 to 4 tons5 to 6 tons7 to 8 tons6 to 7 tons
Chicken manure or vermicompost, 14 days before transplanting10 bags10 bags10 bagsNot in the plan
Zinc sulfate on the seedbed, 7 to 10 DASNot in the plan1 to 2 kg1 to 2 kg1 to 2 kg
14 14 14 on the seedbed, 10 to 14 DAS2 to 4 kg2 to 4 kg2 to 4 kg4 kg

Add zinc only where the soil lacks it. The sign is dusty brown spots on the upper leaves of stunted plants, 2 to 4 weeks after transplanting. For a mild shortage, use 0.5 kg of zinc sulfate on a 400 square meter seedbed. A severe one gets 2 kg. Our page on micronutrients for rice covers zinc in full.

Rice fertilizer schedule for 3 to 4 tons per hectare

This is the lightest plan, with one basal dose and one top dressing, for fields that usually give 60 to 80 cavans of 50 kg.

Per hectare, in 50 kg bags. DAS in brackets is for direct seeded rice.
Dose100 to 110 days111 to 120 days121 to 130 days
Basal: 1.5 bags 14 14 140 to 14 DAT (10 to 14 DAS)SameSame
Top dressing: 1 bag urea and half a bag 0 0 6028 to 32 DAT (38 to 42 DAS)32 to 36 DAT (48 to 53 DAS)36 to 40 DAT (58 to 62 DAS)

Rice fertilizer schedule for 5 to 6 tons per hectare

Here the urea splits into two top dressings, the first at tillering and the second near panicle initiation. For the basal dose, you can use either 14 14 14 or 16 20 0.

Per hectare, in 50 kg bags. DAS in brackets is for direct seeded rice.
Dose100 to 110 days111 to 120 days121 to 130 days
Basal: 2 bags 14 14 14 or 16 20 00 to 14 DAT (10 to 14 DAS)SameSame
First top dressing: 1 bag urea18 to 22 DAT (24 to 28 DAS)22 to 26 DAT (32 to 36 DAS)26 to 31 DAT (36 to 40 DAS)
Second top dressing: 1 bag urea and half a bag 0 0 6028 to 32 DAT (38 to 42 DAS)32 to 36 DAT (48 to 53 DAS)36 to 40 DAT (58 to 62 DAS)

For 7 to 8 tons per hectare

Per hectare, in 50 kg bags. DAS in brackets is for direct seeded rice.
Dose100 to 110 days111 to 120 days121 to 130 days
Basal: 4 bags 14 14 140 to 14 DAT (10 to 14 DAS)SameSame
First top dressing: 2 bags urea18 to 22 DAT (24 to 28 DAS)22 to 26 DAT (32 to 36 DAS)26 to 31 DAT (36 to 40 DAS)
Second top dressing: 2 bags urea and 1 bag 0 0 6028 to 32 DAT (38 to 42 DAS)32 to 36 DAT (48 to 53 DAS)36 to 40 DAT (58 to 62 DAS)

For hybrid rice, 6 to 7 tons per hectare

The hybrid plan uses 16 20 0 for the basal dose. Note that for 100 to 110 day hybrids, the basal window closes earlier, at 10 DAT.

Per hectare, in 50 kg bags. DAS in brackets is for direct seeded rice.
Dose100 to 110 days111 to 120 days121 to 130 days
Basal: 3 bags 16 20 00 to 10 DAT (10 to 14 DAS)0 to 14 DAT (10 to 14 DAS)0 to 14 DAT (10 to 14 DAS)
First top dressing: 1 bag urea18 to 22 DAT (24 to 28 DAS)22 to 26 DAT (32 to 36 DAS)26 to 31 DAT (36 to 40 DAS)
Second top dressing: 1 bag urea and half a bag 0 0 6028 to 32 DAT (38 to 42 DAS)32 to 36 DAT (48 to 52 DAS)36 to 40 DAT (58 to 62 DAS)

What the bags add up to

Our sum of the inorganic bags above, in kg of nutrient per hectare. Straw and manure add more on top.
PlanNitrogen (N)Phosphate (P2O5)Potash (K2O)
3 to 4 tons33.510.525.5
5 to 6 tons, with 14 14 14601429
7 to 8 tons1202858
Hybrid, 6 to 7 tons703015

How to apply each dose

  • Mix the basal dose into the mud during the final harrowing or by 14 DAT, so it sits where the young roots grow.
  • Keep the first dose light on nitrogen. Only about 30 percent of the season's nitrogen goes in the first application.
  • Top dress into a shallow 2 to 3 cm of water, and close the outlets so the fertilizer stays in your paddy.
  • Spread in the afternoon, after 3 PM, because cooler air means less nitrogen lost as gas.
  • If you practice alternate wetting and drying, pause it on fertilizer days.
Why some lists show fewer bags

The 2022 Abonong Swak plans have the same 5 to 6 ton plan, but the other two are lighter. Their 3 to 4 ton plan uses 1 bag of 14 14 14. Their 7 to 8 ton plan uses 2 bags of 14 14 14 and half a bag of potash. They also date the manure at 14 days after transplanting instead of before. Both are general plans, so treat the gap as one more reason to test your soil. Our page on bags of fertilizer per hectare compares them with the Nueva Ecija quick guide.

Adjust the schedule with a leaf color chart and NPK Plus

The urea rows are the part most worth adjusting. From 14 DAT, read a leaf color chart every 7 days. If 6 or more of 10 leaves read below the critical value, the crop needs nitrogen, even if the schedule says wait. If the leaves stay dark green, you can hold a dose and save the bag.

Before you buy, run your plan through NPK Plus, the fertilizer calculator in anee.io. Pick palay and your bags, and it adds up the nitrogen, phosphorus and potassium per hectare. Then it holds them against the usual rate for rice. If something comes out short or too much, ask Anee, the smart farm technician, what to change.

Once the plan is set, put it on your cropping calendar. In anee.io, every dose gets its date from each lot's own transplanting or sowing day. A lot planted a week late gets its urea a week late too.

Put this fertilizer schedule on your calendar

Sign up free, add your lots with their variety and transplanting date, and anee.io dates every bag for you.

Start free

Questions about the rice fertilizer schedule

What is the fertilizer schedule for 5 to 6 tons of palay?
The general plan uses 2 bags of 14 14 14 or 16 20 0 per hectare by 14 DAT. Then comes 1 bag of urea between 18 and 31 DAT. The last dose, 1 bag of urea with half a bag of 0 0 60, lands between 28 and 40 DAT. The exact days follow your variety's maturity.
Can I use this schedule for direct seeded rice?
Yes. Use the DAS dates in brackets. Direct seeded rice gets its top dressings later in the count, because the days start at sowing instead of transplanting.
Do I really need the straw and manure?
The plan counts on them to supply part of the nutrients and to build the soil. Without them, the bags alone may fall short of the target, so watch the leaf color chart closely.
How do I scale the schedule down for a small lot?
Multiply by the area in hectares. On the 5 to 6 ton plan, 2,500 square meters takes half a bag of 14 14 14 at basal. Each top dressing then takes a quarter bag of urea, plus about 6 kg of 0 0 60 with the second.